Deutsche Bundesbahn modernised the Fils Valley Railway between Stuttgart and Ulm up to 12 October 1981, introducing reversible working of the tracks.
2.
The ticket office and platform 1 can be accessed directly from street level on the west side of the station or by a footbridge from the east side; platform 2 is accessible from the street ( Mount Pleasant Road ) or footbridge by stairs and a staff-operated lift . Both platforms are signalled for reversible working and trains arrive / depart at either platform in either direction.